Measure G Projects

Measure G Projects

On January 26, 2017, the Board designated and prioritized projects for the first issuance of bond funds including the modernization of eleven (11) schools (combined with 60% state modernization funds), furniture needs associated with modernization work, technology needs associated with modernization work,  the reconstruction of Chino High School, the construction of Preserve school #2, and science classroom additions/renovations at all junior high schools and Ayala High School.

Most recent Construction Update Reports

  • Schools: Anna Borba ES, Glenmeade ES, Litel ES, Marshall ES, Oak Ridge ES, and Walnut Ave ES:

    Six elementary school sites had their administration offices relocated towards the front of the school to create a single point of entry to the school. 

    Group A:

    Anna Borba ES, Marshall ES, and Walnut were completed in August 2024

    Group B:

    Glenmeade ES, Litel ES, and Oak Ridge ES were completed in December 2024.

  • All school sites within the District will be receiving safety and security upgrades. These upgrades include: keyless access control system, security cameras, security alarm upgrades, and single point of entry modifications.

    • The sixth (and last) phase of the keyless access project is in progress.
      • Phase 1: Ayala HS, Buena Vista HS, Chino Hills HS, and Don Lugo HS have been completed.
        • Chino HS received safety and security upgrades during the rebuild of the new buildings at Chino HS.
      • Phase 2: Junior high school with completed Safety and Security projects: Magnolia JH, Ramona JH, and Woodcrest JH
        • Canyon Hills JH and Townsend JH have the Safety and Security project completed during the current modernization project that finished in September 2021.
      • Phase 3: Briggs K-8, Cal Aero Preserve K-8, Anna Borba, Chaparral ES, Cortez ES, Dickey ES, and Liberty ES Safety and Security upgrades were completed in November 2020.
      • Phase 4: Dickson ES, Glenmeade ES, Marshall ES, Newman ES, and Rhodes ES Safety and Security upgrades were completed in April 2021.
      • Phase 5: Butterfield Ranch ES, Eagle Canyon ES, Hidden Trails ES, Walnut Ave ES, and Wickman ES Safety and Security upgrades were completed in October 2021.
      • Phase 6: Alternative Education Center (AEC), Adult School, and the old El Rancho ES charter school - Safety and Security upgrades will be completed in August 2022.
    • Raptor, the Visitor Management System, has been installed at all school sites. All school visitors and volunteers will be required to scan their driver's license or state-issued I.D. to obtain a visitor pass prior to entering campus.
  • The new buildings at Chino High School are ready for use! Students and staff began the 2022-2023 school year in the new buildings! 

    The existing classroom buildings are in the process of being torn down and new athletic fields built in the same location on the south of campus.

    The new athletic fields will be completed and ready for use by the end of April 2023.

    Design and engineering services are in progress with WLC Architects. Balfour-Beatty Construction Inc. has been approved by the School Board as the construction management firm for the Chino High School project.

     

    Pictures of the new Chino High School buildings:

    An aerial view shows a large, modern school campus with multiple buildings, a central courtyard, athletic fields, a swimming pool, and extensive parking lots, situated within a suburban area.

     

    Sod on the new baseball fields:

    A baseball field with freshly cut grass and palm trees in the background. A baseball field is being watered by a sprinkler system. A baseball field with green grass and a dirt infield, surrounded by palm trees.

     

    Campus Overhead

    An aerial view of a modern high school campus with multiple buildings, a central courtyard, and athletic fields.

     

    North Campus Entry

    A rendering of a modern school building with a large grassy area and a statue in front.

     

     Picture of the Chino HS Groundbreaking Ceremony:

    Construction equipment and a sign for "Simi High School Art Reconstruction" are present at a groundbreaking ceremony marked with balloons and shovels on a grassy field.

    • Modernization at eleven (11) school sites:
      • Cattle ES, Litel ES, and Oak Ridge ES: Phase 1, 2, and 3: Modernization was completed in early spring 2018.
      • Country Springs ES and Rolling Ridge ES: Modernization was completed in early August 2020.
      • Canyon Hills JH and Townsend JH modernizations were completed in September 2021.
      • Butterfield Ranch ES and Hidden Trails ES: modernization was completed in December 2022. 
      • Ruben S. Ayala HS: Multiple phases completed in October 2023.
      • Eagle Canyon ES modernization was completed in June 2024
  • Schools: Briggs K-8, Canyon Hills JHS, Magnolia JHS, Ramona JHS, and Townsend JHS:

    • WLC Architects design and engineering services are complete at Briggs K-8, Magnolia JH, and Ramona JH. Construction is completed at these sites.
    • Arcadis, Inc. has been approved by the School Board as the construction management firm for the science lab project at Briggs K-8 School. Construction was completed in August 2020.
    • ACC Construction is the contractor for Magnolia JHS and Ramona JHS science wing upgrades. Construction has been completed at both schools.
    • Upgrades to science labs at Canyon Hills JHS and Townsend JHS were completed during the modernization of these schools.
  • On May 3, 2018, the School Board approved Measure G bond funds for renovations and upgrades to the former El Rancho ES facilities and infrastructure.