Conceptual model of the new Chino High campus

What's the latest on Measure G? From Aug. 31 Board Study Session

  • A virtual “fly over” of the proposed new Chino High campus was among the highlights of a Chino Valley Unified School District Board of Education study session held Aug. 31 to discuss progress of the Measure G school construction and modernization bond.

    Reconstruction of the more than 60-year-old Chino High campus is among the long list of projects for the $750 million bond approved by voters in November 2016.

    To see the PowerPoint presentation from the Aug. 31 meeting, click on the link below:

    https://wlcarchitects2.box.com/s/zli9rqyq4q5fupp5fli2zzns7kvrsuev

     

    To see a video on the proposed reconstruction of Chino High, click on the link below:

    https://wlcarchitects2.box.com/s/5meaume874uwnptfq0ezrk3664ro75yg

    (The download takes a few seconds)

     

    (Pictured above: Conceptual drawing of the new Chino High campus with entrance on Jefferson Avenue and ballfields and student parking lot on Park Place)